A Rapid Solution that Enables a Successful Sidetrack from an 18-inch Casing in the Gulf of Mexico.
Wellbore Integrity Solutions (WIS) engineering, manufacturing, and operational teams successfully collaborated on deploying a TrackMaster Select* System to sidetrack from 18 in., 117 lbm/ft, P-110 casing resulting in the recovery of the 16.5 in. hole section.
Result
- A successful sidetrack operation utilizing team collaboration for planning, deployment, and execution.
- An urgent mobilization time-frame was met.
- A 28 ft long window was milled and 15 ft of rathole drilled.
- Subsequent drilling BHA and liner assemblies were deployed without issues.
- A 16.5 in. hole section was recovered for the customer.
Download the Bulletin for more details
*Mark of Wellbore Integrity Solutions.