Wellbore Integrity Solutions (WIS) executed a successful OH sidetrack 1,370 feet beyond a previous OH whipstock, preserving lateral footage with a whip-thru-whip maneuver.
Successful Dual Whipstock Deployment for Innovative Open Hole (OH) Sidetracking Operation for a major Delaware Basin operator.
Results:
• Both whipstock systems preserved a total of 8,900 ft (95%) of lateral length.
• Reliable sidetracking method with a known kickoff point reduced time, cost, risk and uncertainty of alternative sidetracking methods.
• Impeccable planning and execution enable TrackMaster Systems to achieve groundbreaking results by deploying a second whipstock across a previously installed one in the open hole lateral section.
*Mark of Wellbore Integrity Solutions.