Open Hole (OH) Lateral Sidetrack Achieved with the TrackMaster* Whipstock System on a Shear Sub

Wellbore Integrity Solutions (WIS) successfully executed an open hole sidetrack with a WhipStock setting depth at 14,100 ft MD to bring up a previous irretrievable fish.

Wellbore Integrity Solutions (WIS) successfully planned and executed a 6-1/8 inch OH lateral sidetrack with a customer in the Permian Basin.

Results:

• The TrackMaster system with the shear sub was key in achieving the OH lateral sidetrack around a previous irretrievable  fish, reducing the risk and uncertainty of alternative sidetracking methods. 

*Mark of Wellbore Integrity Solutions.