Creative Fishing Restores Well Production in Kazakhstan

Wellbore Integrity Solutions’ (WIS) Red Baron fishing and remedial services successfully completed a complex workover in a valuable, producing well. 

Results:

• Retrieved 450m of ESP cable with a modified rope spear 
• Retrieved 350m of ESP cable with a custom designed and manufactured Junk Basket
• Retrieved 84 joints of production tubing with the LH Die Collar 
• Milled and retrieved the 7-inch hydraulic packer
• Completed the project to the customer’s satisfaction 

*Mark of Wellbore Integrity Solutions.