An Outstanding Pilot Milling Performance in Brunei Results in >$2M in Cost Savings

A step change in total meterage milled and a ROP improvement of 182% compared to offset data was achieved. The operational rig time was reduced by 9½ days.

Results:

•  A successful milling operation with no non-productive time (NPT).
•  An improvement of 182% in overall ROP.
•  A rig time reduction of 9 ½ days and a cost savings for the customer of > $2M.
•  Significant reductions in emissions generated.

*Mark of Wellbore Integrity Solutions.