A step change in total meterage milled, and a ROP improvement of 182% compared to offset data was achieved. The operational rig time was reduced by 9½ days.
Results:
• Accomplished sidetrack successfully in a hard rock formation. • The TrackMaster Select System was retrieved after drilling operations to enable multi-lateral production. • Customer satisfaction that the complex objectives were achieved.
*Mark of Wellbore Integrity Solutions.